ironoreindonesia | Unsorted

Telegram-канал ironoreindonesia - IRON ORE INDONESIA

-

Iron Ore Mining We are looking for investors or punans to cooperate in the Iron Ore mining field

Subscribe to a channel

IRON ORE INDONESIA

Who are interested in partnering and investing with us, pleas contact the Whats App number +6281271161382 and email : lee.daenk46@gmail.com
For futher discussion and too see the proposal and mine legality data

Читать полностью…

IRON ORE INDONESIA

To : investor. introduce me from Indonesia, the owner of an iron ore mine who is looking for serious investors for my iron ore mine, I hereby send you a summary of my mine, maybe you are interested in investing, before I say many thanks , and apologize for interrupting your time.

I. Submission of the First Option:

Summary of project development planning proposals for an iron ore mine and steel smelter. Blind blast furnaces have 3 development priority scales, namely mining and production plans consisting of:
1) Building a mine, bascamb, mining road, middle stock file between the mine and jetty and building a pier.
2) build a blast furnace smelting plant, to produce raw steel from iron ore,
3) buy two smelters to produce billets so that they can be sold to local and international markets.

Iron ore mining data For potential investors who are interested:

* Land area of ​​1,343 hectares.
* Deposit of 40.4 million Metric tons
(the result of exploration is 5% of the land, the remaining 95% has not been explored).
* Fe Iron Ore 69%.
* Complete Mining Production Permit,
* 4 zones Production Plan totaling 240,000 tons / month.
* The selling price of raw iron ore in the local market is $ 85 / mt,
* Planned mine building project and steel mill construction with Blast Furnace process with final Steel Billet.
* Billet steel prices are $ 500- $ 800 / tonne.
* JV cooperation contract for 15 years.
* Gross profit when selling raw materials in local markets: 40,400,000 mt (5% mine deposit) x $ 85 = $ 3,434,000,000 usd.
* Monthly gross profit of 240,000 tonnes - 30% (depreciation of smelting) X $ 500 (Steel Billet price) = $ 84,000,000 usd / month
* Gross profit if iron ore is produced into steel billets: 40,400,000 mt (5% mine deposit) - 30% (smelting depreciation) x $ 500 (steel billet price) = $ 14,140,000,000 usd./ over investment or 15 years
* A $ 750 million USD investment fund including construction of a blast furnace and purchase of two factories to process Billets
* BEP steel for a maximum of 15 months.
* 60% profit sharing for investors 40% owner.


II. Submission of the second option: Summary of offers for the Iron Ore Mining JV cooperation proposal for potential investors in this second option prioritizing the construction of mines and facilities with the target of producing raw materials for mining iron ore to target local market needs that have submitted an official order to the mine owner, submitting the proposal are as follows :
* Land area of ​​1,343 hectares.
* Mining location in South Sumatra province, Indonesia.
* Total Mine Deposits 40,400,000 metric tons (exploration yield is 5% land, the remaining 95% has not been explored).
* Iron Ore content 69%. (Lab test results) (one of the highest grade iron ore mines on the planet)
* Complete Mining Production Permit,
* 4 zones Production Plan totaling 240,000 tons / month.
* The selling price of raw iron ore in the local market is $ 85 / mt,
* Road from mine to port 130 km * JV cooperation contract for 15 years. * Project work period for 4 months. entered in the 5th month to start production.
* Gross profit when selling raw materials in local markets: 40,400,000 mt (5% mine deposit) x $ 85 = $ 3,434,000,000 usd.
* Investment funds needed:
Invested in building mine and facilities as well as operating costs for production for 5 months totaling $ 110 million. BEP for 13 months. with a profit sharing system of 60% for investors and 40% for owners.

Читать полностью…

IRON ORE INDONESIA

Untuk: investor. Perkenalkan saya dari Indonesia, Pemilik tambang bijih besi yang mencari investor serius untuk tambang bijih besi saya, saya dengan ini mengirimkan ringkasan saya, mungkin Anda tertarik untuk berinvestasi, sebelum saya mengucapkan terima kasih banyak, dan minta maaf karena mengganggu waktu Anda I. Pengajuan opsi pertama: Ringkasan Proposal Perencanaan Pengembangan Proyek untuk Tambang Bijih Besi dan Baja Smelter. Buta Blast Furnaces memiliki 3 skala prioritas pengembangan, yaitu rencana penambangan dan produksi yang terdiri dari: 1) Membangun tambang, Bascamb, jalan pertambangan, file stok tengah antara tambang dan dermaga dan membangun dermaga. 2) Membangun tanaman peleburan tungku ledakan, untuk menghasilkan baja mentah dari bijih besi, 3) membeli dua smelter untuk menghasilkan billet sehingga dapat dijual ke pasar lokal dan internasional. Data penambangan bijih besi untuk investor potensial yang tertarik: * Luas tanah 1.343 hektar. * Setoran 40,4 juta metrik ton (hasil eksplorasi adalah 5% dari tanah, sisanya 95% belum dieksplorasi). * Bijih besi Fe 69%. * Izin produksi penambangan lengkap, * Rencana produksi 4 zona berjumlah 240.000 ton / bulan. * Harga jual bijih besi mentah di pasar lokal adalah $ 85 / MT, * proyek pembangunan tambang yang direncanakan dan konstruksi pabrik baja dengan proses tungku blast dengan billet baja akhir. * Harga baja billet adalah $ 500- $ 800 / ton. * Kontrak Kerjasama JV selama 15 tahun. * Laba kotor saat menjual bahan baku di pasar lokal: 40.400.000 MT (setoran tambang 5%) x $ 85 = $ 3.434.000.000 USD. * Laba kotor bulanan 240.000 ton - 30% (depresiasi peleburan) x $ 500 (harga billet baja) = $ 84.000.000 USD / bulan * laba kotor jika bijih besi diproduksi menjadi billet baja: 40.400.000 MT (deposit tambahan 5%) * 60% Bagi laba untuk investor 40% pemilik.


Salam
Whats App +6281271161382. Email: lee.daenk46@gmail.com

II. Pengajuan opsi kedua: Ringkasan penawaran untuk proposal kerjasama bijih bijih besi untuk investor potensial dalam opsi kedua ini memprioritaskan pembangunan tambang dan fasilitas dengan target produksi bahan baku untuk menambukan bijih besi untuk menargetkan perintah resmi kepada tambang * Lokasi pertambangan di Provinsi Sumatera Selatan, Indonesia. * Total timbunan tambang 40.400.000 metrik ton (hasil eksplorasi adalah 5% lahan, sisanya 95% belum dieksplorasi). * Konten bijih besi 69%. (Hasil tes laboratorium) (salah satu tambang bijih besi kelas tertinggi di planet ini) * Izin produksi penambangan lengkap, * Rencana produksi 4 zona berjumlah 240.000 ton / bulan. * Harga jual bijih besi mentah di pasar lokal adalah $ 85 / MT, * Road dari tambang hingga port 130 km * Kontrak kerja sama JV selama 15 tahun. * Periode kerja proyek selama 4 bulan. dimasukkan pada bulan ke-5 untuk memulai produksi. * Laba kotor saat menjual bahan baku di pasar lokal: 40.400.000 MT (setoran tambang 5%) x $ 85 = $ 3.434.000.000 USD. * Dana investasi diperlukan: berinvestasi dalam membangun tambang dan fasilitas serta biaya operasi untuk produksi selama 5 bulan dengan total $ 110 juta. BEP selama 13 bulan. Dengan sistem pembagian keuntungan 60% untuk investor dan 40% untuk pemilik. Investor potensial yang tertarik dapat menghubungi kami

Via Whats App +6281271161382.
Email: lee.daenk46@gmail.com

SALAM

Читать полностью…

IRON ORE INDONESIA

Who are interested in partnering and investing with us, pleas contact the Whats App number +6281271161382 and email : lee.daenk46@gmail.com
For futher discussion and too see the proposal and mine legality data

Читать полностью…

IRON ORE INDONESIA

Kepada: investor. perkenalkan saya dari indonesia pemilik tambang bijih besi yang sedang mencari investor serius untuk tambang bijih besi saya, dengan ini saya kirimkan ringkasan tambang saya, mungkin anda tertarik untuk berinvestasi, sebelumnya saya ucapkan banyak terima kasih, dan minta maaf karena mengganggu waktu Anda.

I. Pengajuan Opsi Pertama:

Ringkasan proposal perencanaan pengembangan proyek untuk tambang bijih besi dan peleburan baja. Blind blast furnace memiliki 3 skala prioritas pengembangan yaitu penambangan dan rencana produksi yang terdiri dari:
1) Membangun tambang, bascamb, jalan tambang, middle stock file antara tambang dan jetty serta membangun dermaga.
2) membangun pabrik peleburan tanur sembur, untuk menghasilkan baja mentah dari bijih besi,
3) membeli dua smelter untuk memproduksi billet agar bisa dijual ke pasar lokal dan internasional.

Data penambangan bijih besi Bagi calon investor yang berminat:

* Luas tanah 1.343 hektar.
* Deposit 40,4 juta Metrik ton
(hasil eksplorasi 5% lahan, sisanya 95% belum dieksplorasi).
* Fe Bijih Besi 69%.
* Izin Produksi Pertambangan Lengkap,
* Rencana Produksi 4 zona dengan total 240.000 ton / bulan.
* Harga jual bijih besi mentah di pasar lokal $ 85 / mt,
* Proyek pembangunan tambang yang direncanakan dan konstruksi pabrik baja dengan proses Blast Furnace dengan Steel Billet akhir.
* Harga baja billet adalah $ 500- $ 800 / ton.
* Kontrak kerjasama JV selama 15 tahun.
* Laba kotor saat menjual bahan mentah di pasar lokal: 40.400.000 mt (5% deposit tambang) x $ 85 = $ 3.434.000.000 usd.
* Laba kotor bulanan 240.000 ton - 30% (depresiasi peleburan) X $ 500 (harga Steel Billet) = $ 84.000.000 usd / bulan
* Laba kotor jika bijih besi diproduksi menjadi billet baja: 40.400.000 mt (deposit tambang 5%) - 30% (depresiasi peleburan) x $ 500 (harga billet baja) = $ 14.140.000.000 usd./ lebih dari investasi atau 15 tahun
* Dana investasi $ 750 juta USD termasuk pembangunan tanur tinggi dan pembelian dua pabrik untuk memproses Billet
* Baja BEP untuk maksimal 15 bulan.
* Bagi hasil 60% untuk investor 40% pemilik.


II. Pengajuan opsi kedua: Ringkasan penawaran proposal kerjasama Penambangan Bijih Besi JV bagi calon investor pada opsi kedua ini mengutamakan pembangunan tambang dan fasilitas dengan target produksi bahan baku untuk penambangan bijih besi dengan target kebutuhan pasar lokal yang telah diajukan perintah resmi kepada pemilik tambang, pengajuan proposal adalah sebagai berikut:
* Luas tanah 1.343 hektar.
* Lokasi penambangan di provinsi Sumatera Selatan, Indonesia.
* Total Deposit Tambang 40.400.000 metrik ton (hasil eksplorasi 5% lahan, sisanya 95% belum dieksplorasi).
* Kandungan Bijih Besi 69%. (Hasil uji lab) (salah satu tambang bijih besi kelas tertinggi di planet ini)
* Izin Produksi Pertambangan Lengkap,
* Rencana Produksi 4 zona dengan total 240.000 ton / bulan.
* Harga jual bijih besi mentah di pasar lokal $ 85 / mt,
* Jalan dari tambang ke pelabuhan 130 km * Kontrak kerjasama JV selama 15 tahun. * Masa kerja proyek selama 4 bulan. masuk pada bulan ke-5 untuk memulai produksi.
* Laba kotor saat menjual bahan mentah di pasar lokal: 40.400.000 mt (5% deposit tambang) x $ 85 = $ 3.434.000.000 usd.
* Dana investasi dibutuhkan:
Diinvestasikan untuk membangun tambang dan fasilitas serta biaya operasi untuk produksi selama 5 bulan sebesar $ 110 juta. BEP selama 13 bulan. dengan sistem bagi hasil 60% untuk investor dan 40% untuk pemilik.

Читать полностью…

IRON ORE INDONESIA

Untuk: investor. Perkenalkan saya dari Indonesia, Pemilik tambang bijih besi yang mencari investor serius untuk tambang bijih besi saya, saya dengan ini mengirimkan ringkasan saya, mungkin Anda tertarik untuk berinvestasi, sebelum saya mengucapkan terima kasih banyak, dan minta maaf karena mengganggu waktu Anda I. Pengajuan opsi pertama: Ringkasan Proposal Perencanaan Pengembangan Proyek untuk Tambang Bijih Besi dan Baja Smelter. Buta Blast Furnaces memiliki 3 skala prioritas pengembangan, yaitu rencana penambangan dan produksi yang terdiri dari: 1) Membangun tambang, Bascamb, jalan pertambangan, file stok tengah antara tambang dan dermaga dan membangun dermaga. 2) Membangun tanaman peleburan tungku ledakan, untuk menghasilkan baja mentah dari bijih besi, 3) membeli dua smelter untuk menghasilkan billet sehingga dapat dijual ke pasar lokal dan internasional. Data penambangan bijih besi untuk investor potensial yang tertarik: * Luas tanah 1.343 hektar. * Setoran 40,4 juta metrik ton (hasil eksplorasi adalah 5% dari tanah, sisanya 95% belum dieksplorasi). * Bijih besi Fe 69%. * Izin produksi penambangan lengkap, * Rencana produksi 4 zona berjumlah 240.000 ton / bulan. * Harga jual bijih besi mentah di pasar lokal adalah $ 85 / MT, * proyek pembangunan tambang yang direncanakan dan konstruksi pabrik baja dengan proses tungku blast dengan billet baja akhir. * Harga baja billet adalah $ 500- $ 800 / ton. * Kontrak Kerjasama JV selama 15 tahun. * Laba kotor saat menjual bahan baku di pasar lokal: 40.400.000 MT (setoran tambang 5%) x $ 85 = $ 3.434.000.000 USD. * Laba kotor bulanan 240.000 ton - 30% (depresiasi peleburan) x $ 500 (harga billet baja) = $ 84.000.000 USD / bulan * laba kotor jika bijih besi diproduksi menjadi billet baja: 40.400.000 MT (deposit tambahan 5%) * 60% Bagi laba untuk investor 40% pemilik.


Salam
Whats App +6281271161382 Email: lee.daenk46@gmail.com

Читать полностью…

IRON ORE INDONESIA

Who are interested in partnering and investing with us, pleas contact the Whats App number +6285783232321 and email : lee.daenk46@gmail.com
For futher discussion and too see the proposal and mine legality data

Читать полностью…
Subscribe to a channel